The classrooms are completed and the ongoing works will be the opening up of the existing school hall which will follow in our next news item. The classroom block includes a feature brickwork wall which has been renovated and retained from the existing building. The building also. features solar controlled glazing to the south face and a through coloured render walling system to give the building increased thermal efficiency.