Working sensitively with the ironstone fabric of the existing building, we have designed a contemporary addition to the school which incorporates laser cut pre-rusted steel panelling to the main entrance. A newly designed studio hall has its own dedicated entrance, to enable the school to privately let these spaces. The additional, new nursery building is a response to the school wanting to bring this pre-school facility within their site.
Role: Architects, Contract Administrators